Modules and containers
Packing modules, containers and modular homes
We protect containers, building modules, prefabricated elements and modular homes before transport and during storage. The film seals the module tightly, with no need to build a crate or timber casing.
- No timber casing
- Whole modules
- We travel anywhere in Poland
Two groups of loads
What we pack in this category
Containers, building modules and prefabricated elements
We protect containers, building modules and prefabricated elements before transport and during storage. The film seals the module tightly, with no need to build a crate or timber casing.
We heat-shrink it on site, so the module does not have to go anywhere before it is packed. All we need is access to it and room to work around it.
Modular homes
We pack modular homes and prefabricated elements before transport to the building site. The film protects finished interiors and facades from rain and dirt on the road.
We pack whole modules, including large ones. We heat-shrink the film on site, so the size of the module does not force you to split it before packing.
What it changes
Protection without a crate or timber casing
Film heat-shrunk onto the module takes its shape and seals it tightly. There is no need to build a crate or timber casing for it, and no need to transport the module to us: we come with film and equipment to the address you give.
- Whole modules packed, including large ones
- Protection for finished interiors and facades on the road
- No crate or timber casing to build
- Packing on site: in the yard, in the hall, on the building site
- No size limit: we fit the film to the object
- Removed in one go, leaving no marks on the surface
How we do it
How a job runs
- 01EnquiryYou give us the module dimensions, the number of modules, their location and the planned date of transport to the building site.
- 02Quote and dateWe choose the film to suit the dimensions and the transport method, and agree when we will come to your address.
- 03Packing on siteWe arrive with film and torches. We heat-shrink the film onto the module: in the yard, in the hall or already on the trailer.
- 04Module readyInteriors and facades are sealed tightly for the journey and while waiting on the building site.
On video
Packing a modular unit and a container
More:
The video loads from YouTube only after you click it. All videos: Opakuj.com channel on YouTube.
Frequently asked questions
Before you send an enquiry
Do we need to build a crate or timber casing?
No. The film seals the module tightly, with no need to build a crate or timber casing. We heat-shrink it directly onto the module, on site.
Do you pack the module in one piece?
Yes. We pack whole modules, including large ones. We have no size limit: we fit the film to the object on site.
Does the film protect finished interiors?
Yes. The film protects finished interiors and facades from rain and dirt on the way to the building site. It comes off in one go, leaving no marks on the surface.
What do you need to prepare a quote?
The dimensions of the object (length, width, height), its location and the planned transport date. Photos of the load help: you can add them as a link in the form on the home page. Based on this, we choose the film, the equipment and the date of our visit.
Tell us which module needs packing
Give us the dimensions, the number of modules, their location and the planned date, and we will prepare a quote. You can also call: +48 605 525 882.
Other services