Steel structures and building frame elements
Structural elements prepared for shipping and assembly. The film keeps the element sealed throughout transport and while it waits in the yard.
Steel structures
We shrink wrap steel structures, building frame elements, trusses and metal products for transport and outdoor storage. The film seals the structure tightly, even with irregular shapes and large dimensions.
Why protect it
A structure is exposed to moisture not only on the road but also later, while it stands in the yard waiting for assembly. Shrink wrap film heat-shrunk onto the element seals it tightly and keeps out rain, snow and dirt in both situations: in transport and during outdoor storage. When the element is going by ship, salt and moisture inside the container come into play, and the film alone does not deal with that. How we then combine the film with protection from the inside is described on the packing for sea freight page.
The film takes the shape of the structure, so it also covers elements that cannot be packed in a standard way: trusses, sections with sharp edges and oversized products.
Export
In Poland a structure often goes from the manufacturer straight to the construction site, unpacked. For export the journey is longer: the element passes through forwarding, transhipment, cranes and tie-down straps before it reaches its destination. That is why it makes sense to pack a structure going abroad before it leaves the plant.
For road transport within Europe, shrink wrap film is usually enough: it seals the element tightly and keeps out rain, road salt and dirt, even on sharp edges, because for those we choose a thicker film.
For sea freight, film alone is not enough. The load spends weeks in a closed container, and moisture condenses inside. In that case the film is the outer cover, and on the inside VCI or a sealed barrier with a desiccant does the work. When the structure is going to another continent, an IPPC-marked crate is added. Making a crate to size takes 10–14 working days from payment. The layers are described in detail on the packing for sea freight page.
What we pack
Most of our orders come from the metal industry: manufacturers of steel structures and buildings, CNC machining shops and welding plants, manufacturers of steel doors and windows, containers and stainless steel equipment. Each of them packs something different, but the questions are the same: how big the element is, where it is going and how long it will wait for assembly.
Structural elements prepared for shipping and assembly. The film keeps the element sealed throughout transport and while it waits in the yard.
We bind open-frame elements together with strapping before wrapping, so the film has something to rest on, and only then heat-shrink it over the whole element.
Products coming off the production line, packed before dispatch or before going out to the yard. We match the film thickness to the edges and the storage time.
When a structure goes to another plant for powder coating, it has to arrive clean. We seal it in film at the manufacturer's site, and the paint shop cuts the film open just before painting.
We also pack large tanks for long sea voyages: with protection from the inside, in barrier foil and in crates.
Projects
How we work
We start with the dimensions and the place where the structure stands. Only then do we choose the film, the equipment and the date of our visit.
On video
The video loads from YouTube only after you click it. All videos: Opakuj.com channel on YouTube.
Coverage
We come to your hall or yard and pack on site. We have been packing since 2012, all over Poland; our customers in recent years are companies from 14 provinces, and outside Poland we have packed in Germany.
Quote
We quote based on the dimensions, weight and photos of the load. The price depends on the area to be wrapped (m²), the film thickness, the number of elements and travel. For sea freight, protection from the inside is added (barrier, desiccants, VCI).
Documents
We work on a VAT invoice. Company registration details for your supplier database (full name, NIP tax number, KRS number, address) are in the page footer.
With repeat production, companies buy rolls, tapes and a heat gun from us and then pack in-house. One roll holds about 300 m² of 180 or 200 μm film. With one roll, two or three tapes are usually ordered. We ship the same or the next working day, on a VAT invoice. A manufacturer of steel doors and windows, for example, works this way: it buys film from us and packs its series in its own plant.
What to prepare for your enquiry
The more we know at the start, the faster we can prepare a quote.
Don't have everything? Send what you know and we will ask about the rest.
Frequently asked questions
The film seals the structure tightly and keeps out rain, snow and dirt, both in transport and during outdoor storage. For long storage and for elements with sharp edges we choose a thicker film. In a closed container, corrosion protection comes only from VCI or a sealed barrier on the inside, which we add for sea freight.
Yes. Film heat-shrunk onto the structure takes its shape, even with irregular shapes and large dimensions. We bind trusses and open-frame elements together before wrapping, so the film has something to rest on.
It can, but film alone is not enough. In a closed container moisture condenses inside, so for sea freight we add VCI or a sealed barrier with a desiccant on the inside, and for long journeys a crate. This is how we packed silos that spent one and a half to two months at sea on their way to the USA.
We have no size limit: we fit the film to the object on site. We also pack loads that standard packaging cannot cover: tanks, silos and oversized elements.
Other services